This text is not in eCFR or DITA. It is extracted from the Revolutionary FAR Overhaul deviation guide for FAR Part 47. The parsed text is a convenience layer; the Source PDF tab is authoritative. Always verify against the official deviation PDF.
As prescribed in 247.270-4(a). See the Prescription tab for the prescribing policy text.
HARDSHIP CONDITIONS (AUG 2000)
- (a) If the Contractor finds unusual ship, dock, or cargo conditions associated with loading or unloading a particular cargo, that will work a hardship on the Contractor if loaded or unloaded at the basic commodity rates, the Contractor shall—
- (1) Notify the Contracting Officer before performing the work, if feasible, but no later than the vessel sailing time; and
- (2) Submit any associated request for price adjustment to the Contracting Officer within 10 working days of the vessel sailing time.
- (b) Unusual conditions include, but are not limited to, inaccessibility of place of stowage to the ship's cargo gear, side port operations, and small quantities of cargo in any one hatch.
- (c) The Contracting Officer will investigate the conditions promptly after receiving the notice. If the Contracting Officer finds that the conditions are unusual and do materially affect the cost of loading or unloading, the Contracting Officer will authorize payment at the applicable man-hour rates set forth in the schedule of rates of this contract.
Prescription: 247.270-4 Contract clauses
As prescribed in 247.270-4(a). Scope applicability here before applying the clause.
- (a) 252.247-7000, Hardship Conditions.
Version history
One version on record, first captured 2026-06-11 15:54:07, effective March 16, 2026.
Prescription: 247.270-4
Prescribing text cropped from the same deviation PDF.
Clause text (page 10)
Rendered from the deviation PDF. Open the full PDF.