A community resource for the acquisition workforce not a .gov website
part52.dev Federal Acquisition Clause Monitor
R-DFARS Clause

252.246-7003

Notification of Potential Safety Issues
Source deviation PDF →
Effective Date
February 1, 2026
Deviation
Versions
1

This text is not in eCFR or DITA. It is extracted from the Revolutionary FAR Overhaul deviation guide for FAR Part 46. The parsed text is a convenience layer; the Source PDF tab is authoritative. Always verify against the official deviation PDF.

As prescribed in 246.370(a). See the Prescription tab for the prescribing policy text.

NOTIFICATION OF POTENTIAL SAFETY ISSUES (JAN 2023)

  1. (a) Definitions. As used in this clause— Credible information means information that, considering its source and the surrounding circumstances, supports a reasonable belief that an event has occurred or will occur. Critical safety item means a part, subassembly, assembly, subsystem, installation equipment, or support equipment for a system that contains a characteristic, any failure, malfunction, or absence of which could have a safety impact. Safety impact means the occurrence of death, permanent total disability, permanent partial disability, or injury or occupational illness requiring hospitalization; loss of a weapon system; or property damage exceeding $1,000,000. Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for the Contractor or another subcontractor under this contract.
  2. (b) The Contractor shall provide notification, in accordance with paragraph (c) of this clause, of—
    1. (1) All nonconformances for parts identified as critical safety items acquired by the Government under this contract; and
    2. (2) All nonconformances or deficiencies that may result in a safety impact for systems, or subsystems, assemblies, subassemblies, or parts integral to a system, acquired by or serviced for the Government under this contract.
  3. (c) The Contractor—
    1. (1) Shall notify the Administrative Contracting Officer (ACO) and the Procuring Contracting Officer (PCO) as soon as practicable, but not later than 72 hours, after discovering or acquiring credible information concerning nonconformances and deficiencies described in paragraph (b) of this clause; and
    2. (2) Shall provide a written notification to the ACO and the PCO within 5 working days that includes—
      1. (i) A summary of the defect or nonconformance;
      2. (ii) A chronology of pertinent events;
      3. (iii) The identification of potentially affected items to the extent known at the time of notification;
      4. (iv) A point of contact to coordinate problem analysis and resolution; and
      5. (v) Any other relevant information.
  4. (d) The Contractor—
    1. (1) Is responsible for the notification of potential safety issues occurring with regard to an item furnished by any subcontractor; and
    2. (2) Shall facilitate direct communication between the Government and the subcontractor as necessary.
  5. (e) Notification of safety issues under this clause shall be considered neither an admission of responsibility nor a release of liability for the defect or its consequences. This clause does not affect any right of the Government or the Contractor established elsewhere in this contract.
  6. (f)
    1. (1) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts for—
      1. (i) Parts identified as critical safety items;
      2. (ii) Systems and subsystems, assemblies, and subassemblies integral to a system; or
      3. (iii) Repair, maintenance, logistics support, or overhaul services for systems and subsystems, assemblies, subassemblies, and parts integral to a system.
    2. (2) For those subcontracts, including subcontracts for commercial products or commercial services, described in paragraph (f)(1) of this clause, the Contractor shall require the subcontractor to provide the notification required by paragraph (c) of this clause to—
      1. (i) The Contractor or higher-tier subcontractor; and
      2. (ii) The ACO and the PCO, if the subcontractor is aware of the ACO and the PCO for the contract.

Prescription: 246.370 Notification of potential safety issues

As prescribed in 246.370(a). Scope applicability here before applying the clause.

  1. (a) Insert the clause at 252.246-7003, Notification of Potential Safety Issues, in solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial products and commercial services, for the acquisition of—
    1. (1) Repairable or consumable parts identified as critical safety items;
    2. (2) Systems and subsystems, assemblies, and subassemblies integral to a system; or
    3. (3) Repair, maintenance, logistics support, or overhaul services for systems and subsystems, assemblies, subassemblies, and parts integral to a system.

Version history

One version on record, first captured 2026-06-11 15:53:58, effective February 1, 2026.

Prescription: 246.370

Prescribing text cropped from the same deviation PDF.

Prescription for 252.246-7003

Clause text (pages 24–25)

Rendered from the deviation PDF. Open the full PDF.

Source page for 252.246-7003
Source page for 252.246-7003