This text is not in eCFR or DITA. It is extracted from the Revolutionary FAR Overhaul deviation guide for FAR Part 37. The parsed text is a convenience layer; the Source PDF tab is authoritative. Always verify against the official deviation PDF.
As prescribed in 237.7003(a). See the Prescription tab for the prescribing policy text.
PERFORMANCE AND DELIVERY (DEC 1991)
- (a) The Contractor shall furnish the material ordered and perform the services specified as promptly as possible but not later than 36 hours after receiving notification to remove the remains, excluding the time necessary for the Government to inspect and check results of preparation.
- (b) The Government may, at no additional charge, require the Contractor to hold the remains for an additional period not to exceed 72 hours from the time the remains are casketed and final inspection completed.
Prescription: 237.7003 Solicitation provisions and contract clauses
As prescribed in 237.7003(a). Scope applicability here before applying the clause.
- (a) Insert the following clauses in all mortuary service solicitations and contracts, except do not use the clauses at 252.237-7004, Area of Performance, in solicitations or contracts that include port of entry requirements:
- (1) 252.237-7003, Requirements, (insert activities authorized to place orders in paragraph (e) of the clause).
- (2) 252.237-7004, Area of Performance.
- (3) 252.237-7005, Performance and Delivery.
- (4) 252.237-7006, Subcontracting.
- (5) 252.237-7007, Termination for Default.
- (6) 252.237-7008, Group Interment.
- (7) 252.237-7009, Permits.
- (8) 252.237-7011, Preparation History.
Version history
One version on record, first captured 2026-06-11 15:52:41, effective February 1, 2026.
Prescription: 237.7003
Prescribing text cropped from the same deviation PDF.
Clause text (pages 24–25)
Rendered from the deviation PDF. Open the full PDF.