This text is not in eCFR or DITA. It is extracted from the Revolutionary FAR Overhaul deviation guide for FAR Part 28. The parsed text is a convenience layer; the Source PDF tab is authoritative. Always verify against the official deviation PDF.
As prescribed in 228.371(d). See the Prescription tab for the prescribing policy text.
MISHAP REPORTING AND INVESTIGATION INVOLVING AIRCRAFT, MISSILES, AND SPACE LAUNCH VEHICLES (NOV 2019)
- (a) The Contractor shall report promptly to the Administrative Contracting Officer all pertinent facts relating to each mishap involving an aircraft, missile, or space launch vehicle being manufactured, modified, repaired, or overhauled in connection with this contract.
- (b) If the Government conducts an investigation of the mishap, the Contractor shall cooperate and assist the Government's personnel until the investigation is complete.
- (c) The Contractor shall include a clause in subcontracts under this contract to require subcontractor cooperation and assistance in mishap investigations.
Prescription: 228.371 Additional clauses
As prescribed in 228.371(d). Scope applicability here before applying the clause.
- (d) Insert the clause at 252.228-7005, Mishap Reporting and Investigation Involving Aircraft, Missiles, and Space Launch Vehicles, in solicitations and contracts that involve the manufacture, modification, overhaul, or repair of aircraft, missiles, and space launch vehicles.
Version history
One version on record, first captured 2026-06-11 15:51:45, effective February 1, 2026.